
Joaquín López Pascual, Juan Carlos Meléndez Rodríguez, Pedro Cañamero Molina, Fausto Pedro García Márquez. (2016). «An Overview of Earned Value Management in Airspace industry«, in Proceedings of the Tenth International Conference on Management Science and Engineering Management. Ed. Springer. pp 1465-1477.
Earned value management (EVM) is an effective Project management approach. This method is used to manage Project of different sectors and has been revised to improve its Schedule estimates, the Earned Schedule Management and the Earned Duration Managemente and to include new components as quality, the quelity earned value management. This paper explores the EVM methodology and proposes a model to manage projects aerospace engineers based in a real case study. The inputs in the model are the planning and the monitoring of the case study, planned value, earned value and actual cost of aerospace projects.
Buscar
-
TRIBUNA en EXPANSIÓN23/02/2024
-
¿Es la IA un arma geopolítica?08/08/2026
-
To be or not to be21/03/2026
-
ORDEN MUNDIAL y EUROPA07/02/2026
Categorías
- Banca (6)
- Coronavirus (4)
- Crisis del 2008 (3)
- Crisis Financiera (2)
- crowdfunding (1)
- Dirección Financiera (1)
- Educación y Formación Financiera (34)
- Entorno Económico (13)
- ESG (1)
- FinTech (2)
- Género (1)
- Links de interés (6)
- Mercados Financieros (13)
- microfinanzas (1)
- Neuroeconomía (4)
- Noticias de interés para formación (2)
- Noticias de interés-formación (6)
- Papers Joaquín López Pascual (46)
- Productos Financieros (9)
- Pymes (1)
- Sostenibilidad (9)
- Staggered loans (1)
- Tecnológicas (4)
orcid.org/0000-0002-6236-9853









Síguenos en