Joaquín López Pascual, Juan Carlos Meléndez Rodríguez and Salvador Cruz Rambaud. The Enhanced-Earned Value Management (E-EVM) Model: A Proposal for the Aerospace Industry (Symmetry).
The framework of this paper is the aerospace industry, which is one of the world’s leading sectors, thus playing a noteworthy role in current society. This makes it especially important to try to optimize the management of the aerospace sector.
Otros Papers de Joaquín López Pascual:
https://www.joaquinlopezpascual.com/papers/
orcid.org/0000-0002-6236-9853